Link Logistics Live Oak Phase II

MW Builders worked with Link Logistics and GSR Andrade to complete this 778,950-SF industrial park located in The Colony, Texas. This project is comprised of a logistic and manufacturing center, including four shell buildings with exterior tilt-up concrete and structural steel framing.

The Colony, TX // 778,950 SF // Link Logistics // GSR Andrade // General Construction